Scope of works includes: logistics on site, ramming of 20 IPE hot-formed profiles at multiple depths; pulling of the profiles in vertical, lateral and vertical+lateral direction in order to measure the forces and specific pile displacement. Works are performed for large international EPC contractor and Turkish structure manufacturer.


